Atasoy Denizcilik – Sultan Atasoy Vessel Dry Dock & Maintenance Project

10 February 2026
Atasoy Denizcilik – Sultan Atasoy Vessel Dry Dock & Maintenance Project

Scope of Work – Services Performed

The technical maintenance and renewal activities carried out on the vessel include:

  • Dry Dock Operation: Sandblasting was performed in accordance with SA2 and SA1 standards, and the vessel hull was protected with a three-coat paint system.
  • Cargo Hold Blasting & Painting: Surface preparation and protective coating applications were completed in all cargo holds.
  • Ballast Tank Blasting & Painting: Ballast tanks were blasted and coated with appropriate protective paint systems.
  • Shaft & Propeller Works: Maintenance and repair works were performed on shaft and propeller systems.
  • Pump Maintenance: Periodic maintenance and repair of ballast and fuel pumps were completed.
  • Steel Thickness Measurement & NDT: Full steel thickness measurements were conducted and required Non-Destructive Testing (NDT) inspections were applied.
  • Steel Outfitting Works: Structural steel outfitting and renewal works were completed.
  • Valve Maintenance: Sea chest and overboard valves were maintained and repaired.
  • Sacrificial Anode Replacement: Vessel anodes were replaced to ensure cathodic protection.
  • Ultrasonic Tests: Ultrasonic tightness tests were performed on hatch covers.
  • Piping Outfitting Works: Renewal works were completed on ballast and fuel piping systems.
  • Hatch Cover Rubber Channel Works: Hatch cover rubber channel plates were renewed and newly supplied rubber seals were installed.

Technical Execution & Quality Standards

All works were carried out:

  • In compliance with international marine maintenance and coating standards
  • With a corrosion protection and structural safety focus
  • Verified through inspection and testing procedures
  • By certified and experienced marine technical teams

Operational Benefits Delivered

  • Long-term hull and tank surface protection
  • Improved mechanical system reliability
  • Enhanced sealing and safety performance
  • Reduced risk of critical component failure
  • Increased vessel operational readiness

Call to Action

For similar dry dock, vessel maintenance, and renewal projects, contact our technical team for inspection and project planning support.