ORSA Pilot / Umay Marin – Sandal Vessel Maintenance & Repair Project

02 January 2026
ORSA Pilot / Umay Marin – Sandal Vessel Maintenance & Repair Project

Scope of Work – Services Performed

  • The technical operations completed on the vessel include:
  • Provision Crane Gear Renewal: Gear replacement and mechanical maintenance were performed on provision cranes.
  • Accumulator Maintenance & Repair: Inspection, maintenance, and repair of onboard accumulator systems were completed.
  • Hydraulic System Servicing: Maintenance and servicing of hatch cover hydraulic valves and related hydraulic components were carried out.
  • Hatch Cover Adjustments: Pad adjustments and hinge maintenance & repair works were performed on hatch covers.
  • Hatch Cover Wheel Overhaul: Maintenance and refurbishment of 12 hatch cover wheels were completed.
  • Cargo Hold Surface Preparation & Painting: Full surface blasting/cleaning and protective coating applications were carried out in all cargo holds.
  • Ballast Tank Surface Treatment & Painting: Ballast tanks were treated with surface preparation processes and coated with suitable protective paint systems.

Technical Standards & Execution Quality

All works were executed:

  • In compliance with marine maintenance standards
  • With a safety-first operational approach
  • Focused on extending equipment lifecycle
  • By certified and experienced technical personnel

Operational Benefits Delivered

  • Improved mechanical system performance
  • Increased hydraulic system reliability
  • Reduced risk of critical equipment failure
  • Long-term corrosion protection in holds and ballast tanks
  • Enhanced operational readiness of the vessel

Call to Action

For similar vessel maintenance, repair, and refurbishment projects, you can contact our technical team for inspection, planning, and execution support.